Blue Line (Silk Board–Airport, under construction)

🇮🇳 Blue Line (Silk Board–Airport, under construction)

Namma Metro · Not yet open · ~58 km (planned)

Line Facts

Terminus A
Central Silk Board
Terminus B
Kempegowda International Airport
Stations
Not yet open
Length
~58 km (planned)
Line colour
Blue Line (Silk Board–Airport, under construction)

The Blue Line (Silk Board–Airport, under construction) is not open yet. It is planned to run ~58 km (planned) between Central Silk Board and Kempegowda International Airport. Until it opens, use the lines and connections described in the Namma Metro guide.

Blue Line (Silk Board–Airport, under construction) stations and interchanges →

Fares

Fares on the Blue Line (Silk Board–Airport, under construction) follow the standard Namma Metro fare structure (INR).

View full ticket prices →

Source: Bangalore Metro Rail Corporation Limited (BMRCL). Always verify timetables with the official operator.