Line 9 (Dahisar–Mira-Bhayandar, opening in phases)

🇮🇳 Line 9 (Dahisar–Mira-Bhayandar, opening in phases)

Mumbai Metro · 10 stations · ~11 km

Line Facts

Terminus A
Dahisar (E)
Terminus B
Kashigaon
Stations
10
Length
~11 km
Line colour
Line 9 (Dahisar–Mira-Bhayandar, opening in phases)

The Line 9 (Dahisar–Mira-Bhayandar, opening in phases) is one of 6 lines on the Mumbai Metro, operated by Mumbai Metro One (Line 1), MMMOCL for MMRDA (Lines 2A and 7), MMRC (Line 3). It runs ~11 km between Dahisar (E) and Kashigaon, serving 10 stations.

Line 9 (Dahisar–Mira-Bhayandar, opening in phases) stations and interchanges →

Fares

Fares on the Line 9 (Dahisar–Mira-Bhayandar, opening in phases) follow the standard Mumbai Metro fare structure (INR).

View full ticket prices →

Source: Mumbai Metro One (Line 1), MMMOCL for MMRDA (Lines 2A and 7), MMRC (Line 3). Always verify timetables with the official operator.