Line 5 — Purple (Hemanta Mukhopadhyay–Barasat)

🇮🇳 Line 5 — Purple (Hemanta Mukhopadhyay–Barasat)

Kolkata Metro · 4 stations · 5.0 km

Line Facts

Terminus A
Hemanta Mukhopadhyay
Terminus B
Barasat
Stations
4
Length
5.0 km
Line colour
Line 5 — Purple (Hemanta Mukhopadhyay–Barasat)

The Line 5 — Purple (Hemanta Mukhopadhyay–Barasat) is one of 6 lines on the Kolkata Metro, operated by Metro Railway Kolkata (Indian Railways). It runs 5.0 km between Hemanta Mukhopadhyay and Barasat, serving 4 stations.

Stations on the Line 5 — Purple (Hemanta Mukhopadhyay–Barasat)

All Line 5 — Purple (Hemanta Mukhopadhyay–Barasat) stations →

Fares

Fares on the Line 5 — Purple (Hemanta Mukhopadhyay–Barasat) follow the standard Kolkata Metro fare structure (INR).

View full ticket prices →

Source: Metro Railway Kolkata (Indian Railways). Always verify timetables with the official operator.